Skip to content
(619) 754-4257

Glossary

The vocabulary a kitchen quote will use

Every term below turns up on a real quote, a real plan or a real inspection card. Definitions are plain, and where a term carries a number, the number is the one from published figures rather than a guess.

Allowance
A budgeted sum in a contract for an item you have not chosen yet, most often cabinets, counters, tile, appliances or fixtures. If the item you eventually pick costs more, you pay the difference. An allowance schedule that lists each one separately is what turns a quote into something you can hold to.
Backsplash
The finished surface between the countertop and the underside of the wall cabinets. Usually tile, sometimes a short stone upstand cut from the same slab as the counter, occasionally full-height stone. It is set after the counters so that it lands on the finished surface.
Base cabinet
A cabinet that sits on the floor and carries the countertop. Standard height is 34 and a half inches to the top of the box, giving a 36 inch finished counter height once a typical top is on. Depth is normally 24 inches.
Bearing wall
A wall that carries load from the structure above it down to the foundation. Removing one requires a beam sized for the span, posts carried down to something that can take the load, and in California a design that accounts for seismic forces. A non-bearing partition carries only itself.
Butcher block
A countertop made from strips of hardwood glued together. Warm, repairable by sanding and re-oiling, and needs sealing around a sink. Priced at $40 to $100 per square foot installed in published national figures.
Cabinet refacing
Replacing the doors, drawer fronts, hardware and visible end panels while keeping the existing cabinet boxes in place, usually with a veneer or laminate skin over the face frames. Worth considering where the boxes are sound and the layout already works.
Carcass
The box of a cabinet, as distinct from the door and drawer fronts. Carcass material and construction is the largest difference between a cheap cabinet and an expensive one, and it is the part you cannot see in a showroom display.
CalGreen
The California Green Building Standards Code, Part 11 of Title 24. Chula Vista adopts it through its municipal code alongside the other California codes, and it carries requirements around water use, waste diversion and material selection that can touch a remodel.
Certificate of Appropriateness
The approval required before altering a designated historical resource in Chula Vista where the work needs a building permit. It is issued through the city historic preservation programme and it applies in addition to, not instead of, the ordinary permit.
Change order
A signed amendment adding work that the original contract did not cover, carrying its own price and its own effect on the schedule. A project without a change order process has verbal amendments instead, which is how disputes start.
Crawl space
The void beneath a raised floor. Its presence is one of the most consequential facts about a kitchen project, because it makes moving drain and vent lines dramatically cheaper than it is in a slab-on-grade house.
CSLB
The Contractors State License Board, the California agency that licenses and regulates contractors. Its public lookup shows a licensee's classification, status, expiry date, bond and workers compensation, and its consumer pages carry the rules on contracts, deposits and cancellation.
Filler strip
A narrow piece of matching material used to close the gap between a cabinet run and a wall, or between two cabinets that do not add up to the space available. Stock cabinetry needs them because it comes in fixed widths. How well they are scribed to the wall is a fair proxy for installation quality.
GFCI
Ground-fault circuit interrupter, the protection required on receptacles serving kitchen countertops. It cuts power when it detects current leaking to ground, which is the failure mode that matters near water. AFCI, arc-fault protection, is a separate requirement covering branch circuits.
Hard-wired
An appliance or fixture connected directly to the electrical system rather than plugged into a receptacle. Some kitchen equipment is hard-wired by design, and it affects both the rough-in and what can be swapped out later without an electrician.
HERS rater
An independent third party certified to verify that specified energy measures were installed as designed. In a kitchen the relevant one is range hood airflow, which the California energy code requires to be verified rather than assumed.
High-efficacy lighting
Lighting that meets the efficiency thresholds in the California energy code, which in practice means LED. Permanently installed residential lighting has to meet it, and screw-based lamps have to carry a specific state certification, so incandescent and halogen fixtures cannot go back in during a remodel.
Island
A free-standing cabinet run in the middle of a kitchen. Whether one works is a clearance question rather than a taste question: it needs enough aisle on every side for appliance doors to open with somebody behind them. A sink or cooktop in an island brings drainage or ventilation with it.
Lazy susan
A rotating shelf fitted into a corner base cabinet to make the space at the back reachable. It has to be specified at the time the cabinets are ordered, because a corner cabinet without one is largely wasted volume.
Linear foot
The unit cabinets are usually priced in: one foot measured along the run of the wall, counting base and wall cabinets together in most quotes. It is worth confirming what a given quote includes in the figure, because that varies between suppliers.
Makeup air
Air deliberately brought into a house to replace what a high-capacity range hood extracts. Without it, a powerful hood in a well-sealed house pulls the pressure down and can draw air in through places you would rather it did not, including a combustion appliance flue.
Quartz countertop
An engineered surface made from crushed stone bound with resin. Pattern is consistent across the run, no sealing is required, and what is in the showroom is what arrives. Published national installed figures put it at $50 to $200 per square foot.
Rough-in
The stage where plumbing, electrical and ductwork are installed inside the walls and floor before anything is closed up. Where a permit applies, an inspection happens at the end of rough-in, and getting past it is a real milestone on the schedule.
Scribe
Cutting a piece of material to follow the actual, imperfect line of a wall or ceiling rather than a straight line. Good scribing is the difference between cabinetry that looks built into the room and cabinetry that looks placed in it.
Seismic design category
A classification combining expected ground shaking with soil conditions, used to set structural requirements. San Diego County falls in a high category under the current standard, which is why a beam replacing a bearing wall here is engineered rather than sized by rule of thumb.
Semi-custom cabinets
Cabinetry ordered from a manufacturer's catalogue but with dimensions, finish and internal configuration varied to suit the room. The middle tier between stock and custom, and usually the right answer where a kitchen has a soffit, a bulkhead or an out-of-square corner.
Slab-on-grade
Construction where the floor is a concrete slab poured directly on the ground with no crawl space beneath it. Common across the newer eastern Chula Vista communities. It means any change to drain locations requires saw-cutting and patching the concrete.
Soffit
The boxed-in section above wall cabinets that closes the gap to the ceiling. Removing one and running cabinetry to the ceiling recovers real storage, which makes it a common upgrade in older housing. What is inside it, sometimes ducting or plumbing vents, needs checking first.
Template
The precise measurement a countertop fabricator takes from the installed cabinets, digitally or with a physical pattern, before cutting the stone. It cannot happen before the cabinets are in, and the two to four weeks between template and installation is a real gap in the middle of every kitchen schedule.
Title 24
The part of the California Code of Regulations covering building standards, including Part 6, the Energy Code, and Part 11, CalGreen. California updates it on a three-year cycle, and the current cycle took effect on 1 January 2026. It is what sets the lighting and range hood requirements in a kitchen.
Wall cabinet
A cabinet hung on the wall above the counter. Standard depth is 12 inches, with heights varying by whether the run stops below a soffit or continues to the ceiling. Going to the ceiling adds storage and changes how tall the room reads.

The FAQ answers the questions these terms usually raise, and the guides work through each of them in context.

Want a real price for the kitchen you have in mind?

Call (619) 754-4257 or use the quote form for a free quote. Somebody measures the room and puts the number in writing.